Please Donate! Support

AlGaddafi.org

Google

Bookmark and Share

Great Man Made River  -  لــنهر الصــناعي العظـــيم

  

Ideas for a greener Libya - Working to provide reliable and safe water supply to support agriculture and  cover the domestic water requirements of the Libyan population

العمل على توفير مصدر دائم وآمن للمياه لدعم المشاريع الزراعية  وتغطية الاحتياجات المائية للمستهلكين

Great Man Made River (GMMR) - "Великая Рукотворная Река" в Ливии - Das 8. Weltwunder - لــنهر الصــناعي العظـــيم

The Infrastructure / Operation - The Great Man Made River (GMMR)


Operation

The primary operational objective is to ensure that inflows to the system match outflows from the system as closely as possible at all times.

Under normal conditions the inflow to the system will be determined by agreed quotas based on the forecast requirements registered by the users. The inflow from the well fields into the system can be varied on the basis on the number of well pumps which are brought into operation.

Image description

Image: Pipe factory Brega. (coast of Libya)

Control

The control rooms at the various OS&M's are the hub of all information relating to the Great Man-Made River project. They can access information about the minutest details of the system, from flow rates to the position of valve. From their station operators can identify components requiring maintenance, and operate wellfields and valve remotly. 

Support

Further more the pipe are monitored using state of the electromagnetic and acoustic technologies.

Image description
Image description